Installation guide for integrated panel of exterior wall insulation and decoration
2024-08-26

Installation guide for integrated panel of exterior wall insulation and decoration

External wall insulation and decoration integrated panel is a new type of building material that integrates insulation and decoration. It has attracted widespread attention due to its simple construction and elegant appearance. This article will provide you with a detailed introduction to the installation steps and precautions of the integrated panel for exterior wall insulation and decoration.

1、 Preparation work

Before installation, it is necessary to conduct an on-site investigation to understand the structure, flatness, and other conditions of the wall. Then, based on the design requirements and construction specifications, develop a detailed construction plan. In addition, it is necessary to prepare the required materials and tools, such as integrated boards, adhesives, anchors, cutting tools, etc.

2、 Grassroots treatment

Grassroots treatment is a key step in installing integrated panels for exterior wall insulation and decoration. Firstly, it is necessary to remove dirt, oil stains, and other impurities from the surface of the wall to ensure that it is dry and flat. Then, the wall should be leveled and repaired using cement mortar or specialized leveling materials. Finally, apply interface agent on the surface of the wall to improve the bonding strength between the integrated board and the wall.

3、 Install integrated board

Cut the integrated board into the required size according to the design drawings and construction plan. Then, use adhesive to stick the integrated board onto the wall, paying attention to keeping the board surface flat and free of hollowing. For larger integrated boards, anchoring devices can be used for auxiliary fixation to ensure their stability.

4、 Seam treatment

The joints between integrated boards need to be sealed to prevent moisture and air from penetrating. Special sealant or grout can be used for filling to ensure a tight and smooth joint. At the same time, attention should be paid to the aesthetics of the seams, and line outlining or decorative treatment can be carried out according to design requirements.

5、 Acceptance and maintenance

After installation, a comprehensive inspection of the integrated board is required to ensure that there are no hollowing, detachment, or other phenomena. After passing the acceptance inspection, regular maintenance and upkeep are required to extend its service life.